Chapter 3: Systems Design: Job-Order Costing
Absorption costing: A costing method that includes all manufacturing costs --- direct materials, direct labor, and both variable and fixed manufacturing overhead – in the cost of a product.
Allocation base: A measure of activity such as direct labor-hours or machine-hours that is used to assign costs to cost objects.
Bill of materials: A document that shows the quantity of each type of direct material required to make a product.
Cost driver: A factor, such as machine-hours, beds occupied, computer time, or flight-hours, that causes overhead costs.
Job cost sheet: A form prepared for a job that records the materials, labor, and manufacturing overhead costs charged to that job.
Job-order costing system: A costing system used in situations where many different products, jobs, or services are produced each period.
Materials requisition form: A detailed source documents that specifies the type and quantity of materials to be drawn from the storeroom and that identifies the job that will be charged for the cost of those materials.
Multiple predetermined overhead rates: A costing system with multiple overhead cost pools with a different predetermined overhead rate for each cost pool, rather than a single predetermined overhead rate for the entire company. Each production department is often treated as a separate overhead cost pool.
Normal cost system: A costing system in which overhead costs are applied to a job by multiplying a predetermined overhead rate by the actual amount of the allocation base incurred by the job.
Overapplied overhead: A credit balance in the Manufacturing Overhead account that occurs when the amount of overhead cost applied to Work in Process exceeds the amount of overhead cost actually incurred during a period.
Overhead application: The process of charging manufacturing overhead cost to job cost sheets and to the Work in Process account.
Plantwide overhead rate: A single predetermined overhead rate that is used throughout a plant.
Process costing system: A costing system used in situations where a single, homogeneous product (such as cement or flour) is produced for long periods of time.
Time ticket: A detailed source document that is used to record the amount of time an employee spends on various activities.
Underapplied overhead: A debit balance in the Manufacturing Overhead account that occurs when the amount of overhead cost actually incurred exceeds the amount of overhead cost applied to Work in Process during a period.
分享到:
相关推荐
完整英文电子版 IEC 60300-3-3:2017 Dependability management-Part 3-3:Application guide - Life cycle costing(可靠性管理-第3-3部分:应用指南-生命周期成本计算)。IEC 60300-3-3:2017 对生命周期成本的概念...
SAP-CO-PC-Product-Costing-in-SAP-ERP6-0.pptx
活动成本及活动管理activity based costing and activity based management
作业成本法(Activity-based costing ,ABC)是以作业为中心,通过对作业及作业成本的确认、计量,最终计算产品成本的新型成本管理方法。 它通过对所有与产品相关联作业活动的追踪分析,为尽可能消除“不增值作业”,...
Job Costing Chapter 5 Process Costing Chapter 6 Spoilage and Quality Management Chapter 7 Allocating Costs to Departments Chapter 8 Activity-Based Costing Chapter 9 Activity-Based Management Chapter ...
Business Analysis with Microsoft Excel (5th Edition) By 作者: Conrad Carlberg ISBN-10 书号: 0789759586 ISBN-13 书号: 9780789759580 Edition 版本: 5 出版日期: 2018-12-31 ...21 Pricing and Costing Index
5作业成本法(Activity-Based_Costing_)-用.pptx
Title: Dynamic Costing Author: Troels Troelsen Subjects: Business, Economics Key words: business, finance, value Education Level: Higher Education License: All Rights Reserved - Standard ...
assemble-to-order 定货组装 automated storage/retrieval system(AS/RS) 自动化仓储系统 activity cost pool 作业成本集 activity-based costing 作业基准成本法 available to promise(ATP) 可供销售量 ...
Tasks that traditionally took weeks of work, costing thousands of dollars, can be completed in minutes for a fraction of a penny. This book is a resource for using Microsoft's powerful scripting ...
Product_Costing
预订工作卡,分配员工以记录在工作上花费的时间,该时间转移到时间表中,并添加成本,例如内置库存系统中的物料。 最后创建与XERO在线会计集成的发票或打印PDF发票。
Job Costing App 2.将使项目管理工具的用户体验更加友好,并允许他们向其客户,客户和老板进行实时更新,同时允许他们清楚地跟踪与项目相关的所有费用。 该应用程序将通过跟踪和可视化预算的人工费用,材料费用
the document is used for oracle project costing implementation
1单元1:SAP S/4HANA财务概览2课程:获取SAP S/4HANA概览21单元2:管理会计中的组织结构和主数据22课程:了解SAP S/4HANA中管理会计的新体系结构27课程:管理组织结构48课程:介绍SAP ...获取Product Lifecycle Costing概览
而作业成本法(Activity-based Costing)能够更加精确地确定产品的成本,从而得出更为合理的售价。作业成本法下核算的产品成本更能体现资源耗用的公平性,对期间费用的计算也更加精确。它虽是一种新型的成本核算方法,有...
Assembly Order--装配订单 Assembly Parts List--装配零件表 Automatic Rescheduling--计划自动重排 允许计算机系统当它发现交货日期和需用日期失效时,自动改变预计入库量的交货日期。一般不推荐这种方法。 ...
西兰 与 ECND 项目相关的资产存储库。...在doc/ costing.md上运行pandoc 的命令: pandoc doc/costing.md -S -s --mathjax=http://cdn.mathjax.org/mathjax/latest/MathJax.js?config=TeX-AMS-MML_HTMLorMML -o
录像47_costing planning1-2