之后给各屏幕分配复杂性评分,简单的屏幕为1,适中的屏幕为2,适中的报表为5,汇总表如下:表:项目网页和报告的评估应用点屏幕或报表复杂性权值影片与演员关系表屏幕适
COCOMO评估工具 What is COCOMO? COCOMO (COnstructive COst MOdel) is a screen-oriented, interactive software package that assists in budgetary planning and schedule estimation of a software development project. Through the flexibility of COCOMO, a software project manager (or team leader) can develop a model (or multiple models) of projects in order to identify potential problems in resources, personnel, budgets, and schedules both before and while the potential software package is being developed. The COCOMO software package is based upon the software cost and schedule estimation model: COnstructive COst MOdel version II (COCOMOII). This is the newly revised version of the original COnstructive COst MOdel (COCOMO) first published by Dr. Barry Boehm in his book Software Engineering Economics, Prentice-Hall (1981), and Ada COCOMO (1989) predecessors. The current model is described in [Boehm et al. 1995] The primary objectives of the COCOMOII.1998 effort are: ◾ To develop a software cost and schedule estimation model tuned to the life cycle practices of the 1990's and 2000's. ◾ To develop software cost database and tool support capabilities for continuous model improvement. ◾ To provide a quantitative analytic framework, and set of tools and techniques for evaluating the effects of software technology improvements on software life cycle costs and schedules. The full COCOMOII model includes three stages. Stage 1 supports estimation of prototyping or applications composition efforts. Stage 2 supports estimation in the Early Design stage of a project, when less is known about the project’s cost drivers. Stage 3 supports estimation in the Post-Architecture stage of a project. This version of USC COCOMOII implements stage 3 formulas to estimate the effort, schedule, and cost required to develop a software product. It also provides the breakdown of effort and schedule into software life-cycle phases and activities from the original COCOMO manual. These are still reasonably valid for waterfall model software projects, but need to be interpreted for non-waterfall projects.
软件成本估算旨在预测完成软件项目所需的最实际的工作,因此对于软件项目管理的成功至关重要。 软件成本估算会影响几乎所有管理活动,包括项目投标,资源分配和项目计划。 它受许多因素的影响,例如实施效率以及在软件开发阶段之前完成各种审查和研究的费用。 准确的成本估算将帮助我们在预算范围内按时完成项目。 准确的估算非常重要,因为它导致了对软件成本估算方法的广泛研究。 在这项研究工作中已经研究了一些重要的软件成本估算方法。 此外,我们制定了自己的标准,该标准已用于比较所有不同的所选方法。 我们还为每个评估标准都给出了分数,以便我们可以在数值上比较不同的方法以进行成本估算。 我们的观察结果表明,最好使用多种不同的估算技术或成本模型,然后在确定任何较大差异的原因之前比较结果。 没有一种方法比其他方法更好或更糟。 实际上,我们发现它们的优势和劣势通常是相辅相成的。 因此,主要结论是,没有一种方法能够适合每种情况,并且需要仔细考虑多种不同方法的结果,以发现最有可能产生实际估计的方法。
Basic COCOMO Model 的程序
软件项目工作量估算COCOMO和SLIM模型的应用研究.docx
CSBMK-2020年中国软件行业基准数据 2020年版,内有造价示例。
准确的工作量估算是保证软件开发正常进行的必要手段,COCOMOⅡ模型是估算的重要方法。文中运用功能点分析法估算软件规模,其步骤是估算初始功能点数、估算调整后的功能点数、将功能点转化为源代码行;设计出标称进度工作量、调整进度工作量、标称进度、调整进度等公式对工作量进行估算。
cocomo模型详解cocomo模型详解cocomo模型详解cocomo模型详解cocomo模型详解cocomo模型详解
软件项目工作量估算COCOMO和SLIM模型的应用研究.doc
软件开发成本估算.pdf
工作量估算概述:通过根据软件使用人数,文件数量与结构,软件可靠性要求,代码种类,代码行数等参数输入Cocomo模型查询并计算进行了个人的工作量估计,但最终的估计
使用COCOMO||模型对软件成本估算
cocomo,软件过程控制软件,以及各种版本模型的方法可选
软件开发成本估算的经验模.pptx
主要对COCOMO II的定义以及相关内容进行的阐述
******************************************** 一道分析软件工作量的题目
软件开发成本的估算方法,充分考虑各种风险参数。并提出系数指标取值的方案。